Snag Master is led by licensed civil engineers and MEP specialists with 20+ years in luxury construction QA. We document every structural, mechanical and finish defect with photographic evidence — delivering a formal report within 24–48 hours.
Every Snag Master inspection covers 200+ checkpoints across six critical categories — nothing is left to chance before your property changes hands.
Foundation integrity, load-bearing elements and weatherproofing.
All mechanical, electrical and plumbing installations tested against specifications.
Surface quality and workmanship inspected room by room.
All openings checked for fit, finish and security function.
Wet zones, modular units and fixtures fully tested under operating conditions.
Shared spaces, parking and building envelope checked for handover readiness.
Every Snag Master inspection is conducted by licensed civil engineers and MEP specialists — professionals who have overseen construction of luxury projects valued at ₹500 Cr+. We don’t send trainees.
Only practising civil engineers and registered architects conduct our inspections. No real estate agents, no trainees — ever.
Our inspectors have QA experience on ₹500 Cr+ projects including premium hotels, IT parks and luxury residences across Bangalore.
Reports are formatted for RERA submissions, legal disputes and warranty claims — not just internal use. Court-admissible photographic evidence.
Partnered with 8 Bangalore developers for handover QA programs, cutting post-handover complaints by over 60% within two quarters.
From a one-off buyer inspection to a year-round developer QA contract — choose the model that fits your project and budget.
Time-boxed inspection before developer hands over keys. We catch defects while the contractor is still on site and legally liable. Delivered as a prioritised PDF report.
Buyer ProtectionOn-demand survey at purchase or move-in, marketed as quality assurance and peace of mind. Documents property condition at a fixed point in time for disputes or warranty claims.
Move-in ReadyContracted snagging and pre-delivery QA for developers. Reduces post-handover complaints and warranty callbacks. Sold as bulk or retainer to integrate into your delivery workflow.
Developer QAScheduled re-inspections within the defect liability period to verify contractor remediation, track outstanding snags and manage re-inspection passes — all logged in a live dashboard.
Post-HandoverQuarterly or annual proactive checks for landlords, asset managers and housing societies. Catch deterioration early, maintain asset value and keep residents satisfied.
Ongoing AssuranceShare property details, type, size and handover date. We confirm a qualified inspector and schedule within 48 hours.
Inspector attends with a digital checklist, calibrated tools and a photo log. Every snag is GPS-tagged by room and rated by severity.
A structured PDF report with photo evidence, severity ratings and remediation guidance is delivered within 24–48 hours.
We revisit after the contractor rectifies snags, verify closures and issue a pass certificate for warranty and dispute records.
Every defect is logged with room location, photo proof, severity (High / Medium / Low) and a clear recommendation — formatted for developer submissions, warranty claims and legal records.
Pricing is based on property type, size and scope. Share your details below — we will send you a tailored quote within a few hours.
1 BHK to luxury penthouses — new build, resale or rental move-in
Full envelope inspection including basement, terrace and garden systems
Fit-out quality, MEP systems and common area handover QA
Shell or fit-out inspections before shop-fit and opening day
“Rajesh and his team found a critical beam crack and 14 other defects in our 4BHK at Prestige Lakeside before we signed. The developer fixed everything within 3 weeks. Worth every rupee.”
“As a developer, I was sceptical — but after the first pilot on our Yelahanka project, we mandated Snag Master for all our handovers. The photo-evidenced reports are the most professional I’ve seen in 15 years in this industry.”
“My villa had 31 snag items — things I would never have found myself. The Snag Master report gave me everything I needed to hold the contractor accountable. Their knowledge as civil engineers is the real differentiator.”
Every day without a formal snag report is a day defects go unrecorded. Get in touch and we'll schedule a certified inspector within 48 hours.